London & selected surrounding areas  ·  6-month workmanship guarantee
Urgent Plumbing & Locksmith Help020 3831 5477
fact_checkProperty Care • The Property Notebook

Void Property Checklist for Housing Providers: Locks and Plumbing

A clear void property checklist for the locks and plumbing in a home between tenancies, written for housing associations, councils and larger landlords.

construction
Nobel Build & Repairs
Published 13 October 2026 · Updated 13 October 2026
London housing association homes awaiting void property checks
Property Care Guide5 steps
boltAt a glance

The short answer

A void property checklist makes sure an empty home is secure, safe and ready for the next tenant. For locks and plumbing, the key steps are: secure the property on day one, change or rekey all locks, test every tap, toilet and waste, check the stopcock, drain down if the home will stay empty in cold weather, and record everything for the file. The checklist below is written for housing associations, councils and larger landlords.

01The details

Day one: secure the void

  1. Collect all keys from the outgoing tenant and record how many were returned.
  2. Change the front and back door cylinders or rekey mortice locks.
  3. Check doors and frames for damage and secure any weak points.
  4. Check window locks and fit missing keys or restrictors.
02The details

Plumbing checks

ItemWhat to check
StopcockLocated, labelled and turns fully
TapsNo drips, cartridges or washers sound
ToiletsFlush works, no running, pan seal sound, seat secure
WastesSinks, basins, baths and showers drain freely
Visible pipeworkNo leaks, corrosion or poor joints
Cold water tank (if any)Lid fitted, float valve working, no overflow
ShowerFlow and temperature steady, seals and silicone sound
03The details

If the home will stay empty

  • Drain down in cold weather, or keep low background heat, to prevent frozen pipes.
  • Leave the stopcock off and label it.
  • Arrange regular inspections and keep a log.
04The details

Before the new tenant moves in

  1. Turn the water back on and check for leaks.
  2. Run every tap to flush the system.
  3. Test locks with the new keys and record key numbers.
  4. Photograph completed work for the void file.
05The details

Why use one contractor for both trades?

Using one accredited contractor for locks and plumbing reduces visits, keeps reports in one place and speeds up void turnaround. We are CHAS accredited, SafeContractor approved and Constructionline Gold, and we work with housing associations, councils and agents across London and the Home Counties.

menu_book

Related service: sectors we work with.

Your questions

A few common questions

What should a void property checklist include?expand_more

For locks and plumbing, it should cover securing the property, changing or rekeying all locks, checking window locks, testing taps, toilets, wastes and showers, checking the stopcock, draining down in cold weather if needed, and recording everything with photos and key numbers for the file.

Should locks be changed in every void property?expand_more

Yes, in most cases. Housing providers cannot be sure every key was returned, so changing cylinders or rekeying mortice locks protects the property while empty and gives the new tenant confidence that they control access. Record key numbers for each new lock.

How do you stop pipes freezing in an empty property?expand_more

Either drain the system down or keep low background heating on during cold weather. Turn off and label the stopcock. Carry out regular inspections and keep a log, so any problem is spotted quickly before it causes major damage.

Why use one contractor for void locks and plumbing?expand_more

One contractor for both trades means fewer visits, one point of contact and one report for the file. This shortens void turnaround times and reduces admin for housing associations, councils and agents. Choose a contractor with accreditations such as CHAS and Constructionline Gold.

What accreditations should a void repairs contractor have?expand_more

Housing providers often ask for health and safety accreditations such as CHAS or SafeContractor, plus Constructionline for procurement. Proof of public liability insurance is also standard. These show the contractor has been checked and can work safely on your properties.

A clearer next step

Need a plumber or locksmith?

Nobel Build & Repairs is CHAS accredited, SafeContractor approved and Constructionline Gold. We agree a written price before work starts and guarantee our workmanship for 12 months.